Louisiana Moves Forward With Major I-10 Widening Project

1042
Louisiana I-10 Traffic | Louisiana I-10 Construction | I-10 Exit Guide

Today, the Louisiana Department of Transportation and Development announced that a Notice of Intent has been issued to enter into a Construction Management at Risk (CMAR) contract with a CMAR contractor for the I-10 widening project from LA 415 in West Baton Rouge Parish to the I-10/12 split in East Baton Rouge Parish.

CMAR is an innovative delivery process that uses a design professional that is engaged by DOTD for professional pre-design or design services, or both. Huval & Associates Inc. is the CMAR consultant for this project. DOTD also contracts separately with a CMAR contractor to engage in the pre-construction phase.

ā€œBy using funding and delivery processes that have not been utilized in the past, this administration has advanced long-standing infrastructure projects across the state,ā€ said Governor John Bel Edwards. ā€œMoving the much needed I-10 improvement project to this stage is a testament to the teamwork needed by the state, local and federal officials that must be on board to get things completed.ā€

The successful bidder for this project will be responsible for the construction of the following:

  • Freeway widening by the addition of one travel lane to the westbound direction of I-10 from Washington St. to College Drive and one travel lane to the eastbound direction of I-10 from Washington St. to east of the I-10/I-12 split on I-10. 10 and one travel lane to the westbound direction of I-10 from Acadian Thruway to Washington St.
  • Modifications to interchanges at Washington Street, Dalrymple Drive, Perkins Road, Acadian Thruway, and College Drive, as well as the replacement of the Nairn Drive overpass
  • Associated work, which may include noise barriers, interstate lighting, guide signs, traffic signals, and pedestrian and bicyclist accommodations
  • Roundabouts at Terrace Avenue and Braddock Street, the Washington Street interchange, and Dalrymple Drive at East Lakeshore Drive
  • Utility coordination, as necessary
  • Maintenance of traffic in a congested and confined urban freeway environment
  • Context sensitive solutions and community connections

ā€œTraffic issues throughout the Baton Rouge region have long plagued residents, commuters, and travelers passing through the area,ā€ said Senator Rick Ward, Chairman of the Senate Committee on Transportation, Highways and Public Works. ā€œThis widening project is a huge victory for our weary drivers. I look forward to continuing to work with the Governor, DOTD, and my colleagues in the legislature and community as we work to find more solutions such as this to increase capacity, decrease delays, and improve safety on our roadways.ā€

A contract execution for pre-construction services is anticipated no later than January 2021.


On the road? Why not take us with you. All our websites are mobile-friendly. Visit our growing family of exit guides:  I-4 Exit GuideI-5 Exit GuideI-10 Exit GuideI-75 Exit Guide, and I-95 Exit Guide. Detailed exit service listingsā€¦ discount lodging, camping, food, gas and more for every exit along the way!

Previous articleFlorida’s I-10 Covid-19 Checkpoint Has Been Deactivated
Next articleRolling Lane Closures for I-10 Bridge Inspections in Louisiana Scheduled
I-10 Exit Guide
One of the most complete road travel resources of its kind on the Internet! The Interstate 10 Exit Information Guide features exit service listings for the entire length of I-10 from California to Florida! Food, gas, lodging, rest areas, attractions and moreā€¦